Skip to content
Zero Emission Grid
    • Site Prospecting
    • Multi-Scenario Analysis
    • Interconnection Queue Insights
    • Grid Due Diligence
    • View All Services
     

    Not sure which fit? We’ll advise.

    • Energy Storage
    • Data Centers & Large-Loads
    • Generation
    • Distribution & Transmission
     

    Tell us about your portfolio.

    • REST®
    • Sitra™
    • GridLens | Free
     

    Request a walkthrough or pricing.

    • Upcoming Queue Window
    • Blog
     

    Sign up for the ZEG Newsletter

  • About
  • Careers

Tag: ERCOT

Stay up-to-date with our summaries of ERCOT meetings, covering crucial developments and decisions related to the Texas electric grid and energy market.

ERCOT LLWG 12.11.25: NOGRR282, Large Electronic Load Ride-Through & Frequency Risk

ERCOT LLWG 12.11.25: NOGRR282, Large Electronic Load Ride-Through & Frequency Risk

Detailed summary of ERCOT’s December 11, 2025 LLWG meeting covering NOGRR282 impacts, voltage ride-through study results, and frequency-limit considerations for large electronic loads.

ERCOT RPG 11.11.25: EIR Updates, 2025 RTP Review & Transmission Plan Direction

ERCOT EIR updates, 2025 rtp

The November 11, 2025, meeting of ERCOT’s Regional Planning Group (RPG) convened to advance several critical Electric-Infrastructure Review (EIR) updates, review the 2025 RTP progress, and discuss economic-analysis results tied to transmission planning paths.

ERCOT LLWG 11.20: Large-Load Reporting, Process Improvements & Queue Transparency

ERCOT LLWG 11.20.25 large-load reporting

ERCOT LLWG 11.20.25 summary, covering large-load reporting, modeling requirements, & transmission impacts affecting large-load interconnections.

ERCOT PLWG 11.18: Transmission Planning Updates, RTPDP Refinements & Major RPG Project Coordination

RTPDP Updates, Planning Guide Revisions

Read the ERCOT PLWG meeting, including RTPDP updates, Planning Guide revisions, system modeling requirements, and transmission project coordination.

The Future of Texas Transmission: Understanding the Impact of 765-kV Infrastructure

ERCOT 765-kV infrastructure

ERCOT is evaluating a 765-kV transmission backbone to handle rapid load growth, improve reliability, and boost long-distance transfer capability. Explore the benefits, projects, and planning impacts of Texas’s next major grid expansion.

Navigating ERCOT’s New Large Load Interconnection Standards: Implications of NPRR 1234 and PGRR 115 

ercot nprr 1234 pgrr 115 large load interconnection

ERCOT’s NPRR 1234 and PGRR 115 overhaul how large loads interconnect to the Texas grid. Learn how the new modeling, data, and study requirements affect developers, TSPs, and system planning.

ERCOT PLWG Meeting 10/28/25: Rapid Electrification, Renewable Saturation, and Large-load Interconnection

ERCOT PLWG Meeting 10/28/25: Rapid Electrification, Renewable Saturation, and Large-load Interconnection

ERCOT PLWG Meeting 10/28/25: Rapid Electrification, Renewable Saturation, and Large-load Interconnection

ERCOT RPG Meeting 10/28/25: Upcoming Transmission Planning Efforts, ERCOT Large Load Integration Surge and Grid Impacts, and Proactive Grid Planning

ERCOT RPG 10/28/25 Meeting Highlights: Updates covering ERCOT Large load integration, Transmission Planning, and proactive grid planning

ERCOT RPG 10/28/25 Meeting Highlights: Updates covering ERCOT Large load integration, Transmission Planning, and proactive grid planning

ERCOT LLWG 10/24/25: Assessing Large Load Interconnection & Stability Risks

ERCOT Large Load interconnection Working Group LLWG LELs

Key takeaways from ERCOT’s 10/24/25 LLWG meeting—large load interconnection process updates, transmission upgrade effectiveness, and AI-load stability risks.

ERCOT IBRWG 10/10/2025: Critical Update on NOGRR245 & IBR Compliance

IBRWG meeting, NOGRR245 updates, NOG Section 2.9.1.1(6), and NERC developments

Key takeaways from ERCOT’s Oct 10 2025, IBRWG meeting, including NOGRR245 updates, interpretation of NOG Section 2.9.1.1(6), and NERC developments.

← Previous
Next →
Logo Transparent White
  • Zero-Emission Grid (ZEG)
  • Services
  • REST®
  • About ZEG
  • Contact Us
  • Careers
  • Zero-Emission Grid (ZEG)
  • Services
  • REST®
  • About ZEG
  • Contact Us
  • Careers
Linkedin-in

© 2026 by Zero-Emission Grid, LLC

Terms of Service