Skip to content
Zero Emission Grid
    • Site Prospecting
    • Multi-Scenario Analysis
    • Interconnection Queue Insights
    • Grid Due Diligence
    • View All Services
     

    Not sure which fit? We’ll advise.

    • Energy Storage
    • Data Centers & Large-Loads
    • Generation
    • Distribution & Transmission
     

    Tell us about your portfolio.

    • REST®
    • Sitra™
    • GridLens | Free
     

    Request a walkthrough or pricing.

    • Upcoming Queue Window
    • Blog
     

    Sign up for the ZEG Newsletter

  • About
  • Careers

Tag: ERCOT

Stay up-to-date with our summaries of ERCOT meetings, covering crucial developments and decisions related to the Texas electric grid and energy market.

ERCOT Batch Study Workshop 5: PGRR145, Large Load Updates

ercot batch study workshop 5, batch study process, llis

ERCOT Batch Study Workshop 5: PGRR145, Large Load Updates

ERCOT Large Load Interconnection 2026: What Actually Matters Before You Enter the Queue

A practical, experience-driven guide to navigating ERCOT large load interconnection in 2026, aligned with PGRR145, Batch Zero, and evolving modeling expectations.

An insider guide to ERCOT large load interconnection in 2026, including PGRR145, Batch Zero, CLR, BYOG, and evolving modeling requirements.

ERCOT LLWG March 2026: Large Load Queue Surges to 380 GW, Batch Zero & CLR/BYOG Frameworks Advance

ERCOT LLWG March 2026: Large Load Queue Surges to 380 GW, Batch Zero & CLR/BYOG Frameworks Advance

ERCOT LLWG March 2026: Large Load Queue Surges to 380 GW, Batch Zero & CLR/BYOG Frameworks Advance

ERCOT Large Load Batch Study Workshop #4 (Batch Zero): What Developers Need to Know

ercot large load batch study workshop #4, nprr1325, pgrr145

ERCOT’s March 10, 2026 Large Load Batch Study Workshop #4 reviewed PGRR145 and NPRR1325 and outlined the Batch Zero framework for large load interconnections. Learn key eligibility milestones, study timelines, MW allocation rules, and what developers must prepare before the July 15, 2026 deadline.

ERCOT Large Load Batch Study Workshop #1 Summary February 3, 2026

ERCOT Large Load Batch Study Workshop Feb 26, 2026 summary covering governance timelines, study design, eligibility criteria, and integration with PUCT Project 58481.

ERCOT Large Load Batch Study Workshop #1 Summary held Feb 3, 2026, covering the proposed framework for large load interconnection requests, Batch Zero design concepts, and stakeholder feedback.

ERCOT Large Load Batch Study Workshop Feb 26, 2026 summary

ERCOT Large Load Batch Study Workshop Feb 26, 2026 summary covering governance timelines, study design, eligibility criteria, and integration with PUCT Project 58481.

ERCOT Large Load Batch Study Workshop Feb 26, 2026 summary covering governance timelines, study design, eligibility criteria, and integration with PUCT Project 58481.

ERCOT TAC Feb 25, 2026, Meeting Summary: Large Load Developments, NOGRR245 Perspectives, and Market Governance Updates

Meeting Summary Large Load Developments, NOGRR245 Perspectives, and Market Governance Updates

ERCOT TAC Feb 25 Meeting Summary Large Load Developments, NOGRR245 Perspectives, and Market Governance Updates

ERCOT RIWG Feb 23: Registration Requirements, Ride-Through Compliance, NSG Clarification, AVR Tests for Small DGRs & QSA Updates.

ERCOT Planning Guide Review: Tightening Assumptions and Performance Expectations ERCOT RIWG Feb 23: Registration Requirements, Ride-Through Compliance, NSG Clarification, AVR Tests for Small DGRs & QSA Updates.

ERCOT RIWG Feb 23: Registration Requirements, Ride-Through Compliance, NSG Clarification, AVR Tests for Small DGRs & QSA Updates.

ERCOT PGRR Update: New Dynamic Model & MQT Requirements for Large Loads (LLWG Feb 2026)

ercot pgrr mqt dynamic model

At the February 19, 2026 ERCOT LLWG meeting, a new Planning Guide Revision Request (PGRR) introduced enhanced dynamic modeling and Model Quality Test (MQT) requirements for Large Loads and Large Electronic Loads. Here’s what developers and large-load operators need to know.

PUCT February 20, 2026, Meeting: Key Takeaways for Large Loads and Grid Planning

An insider guide to ERCOT large load interconnection 2026, including PGRR145, Batch Zero, CLR, BYOG, and evolving modeling requirements.

Key takeaways from the February 20, 2026 Public Utility Commission of Texas open meeting, with a focus on large load interconnection standards, ERCOT oversight, and what the lack of discussion signals for project planning.

← Previous
Next →
Logo Transparent White
  • Zero-Emission Grid (ZEG)
  • Services
  • REST®
  • About ZEG
  • Contact Us
  • Careers
  • Zero-Emission Grid (ZEG)
  • Services
  • REST®
  • About ZEG
  • Contact Us
  • Careers
Linkedin-in

© 2026 by Zero-Emission Grid, LLC

Terms of Service