MISO IBR Modeling Requirements Workshop Update: BPM-015 Appendix I Guidance for DPP-2025+ (March 19, 2026)
A technical breakdown of MISO’s IBR modeling requirements, including dynamic model submissions, MQT framework, SMIB testing assumptions, and upcoming compliance milestones.
MISO PAC Feb 25 Meeting Summary
MISO PAC meeting summary held Feb 25, covering transmission planning updates, large load additions, and stakeholder discussions on evolving grid planning challenges across the MISO footprint.
MISO IPWG Jan 2026 Summary: Interconnection Queue Mechanics, Large Load Considerations, Planning, and study expectations
Summary of the January 27, 2026 MISO IPWG meeting, covering interconnection queue mechanics, large load considerations, planning, and study expectations
MISO PAC Jan 2026: Attachment GGG Updates, ZGIAs, and What They Signal for Large Load Integration
Summary of the Jan 21 MISO PAC meeting, covering attachment GGG Updates, ZGIAs, & implications for large load and data center development
MISO Large Load Additions Workshop: Technical Takeaways and Grid Implications (January 30, 2026)
Summary of the Jan 30 MISO Large Load Additions Workshop, covering reliability risks, requirements, speed-to-power constraints, and operational considerations
MISO MTEP Report Summary: Load Growth, Transmission Scale, and Planning Risk Signals
Expert summary of MISO’s MTEP report highlighting load-driven transmission expansion, interconnection risk, and evolving planning assumptions.
MISO IPWG 12.02.25: Interconnection Reform, Modeling Quality, and Study Transparency
Comprehensive recap of MISO’s December 2, 2025 IPWG meeting covering queue reform, modeling challenges, and study transparency.
MISO PAC 11.19.25 Summary: LRTP Advancement, Queue Alignment, Economic Planning & 2026 Model Development
MISO PAC 11.19 meeting summary covering LRTP progress, queue alignment, economic planning, and 2026 Market Efficiency Studies (MES).
MISO SPP IPSAC 11.14.25: Interregional Flowgates, HVDC Coordination & Joint Transmission Planning
Summary of the MISO–SPP IPSAC 11.14.25 meeting covering flowgates, HVDC coordination, queue impacts, and joint planning.
MISO IPWG Highlights 10/16/25: MISO Queue Reform, IBR Modeling Enhancements & MISO Tariff Updates
MISO IPWG Highlights 10/16/25: MISO Queue Reform, IBR Modeling Enhancements & Performance, and MISO Tariff Updates